Project

CBP Logo

Modular CPC

USACE Fort Worth District (KOMAN) | Fixed Price | El Paso Modular CPC | El Paso, TX  For Customs & Border Protection, KOMAN Construction also provided a turnkey solution for a holding facility, able to accommodate detention, toilets, wash basins, showers, and an eating area for at least 800 individuals. We also constructed an exercise […]

Modular CPC Read More »

96th medical group building

Mechanical and Electrical Repairs at the 96th Medical Group

U.S. Army Huntsville Center Corps of Engineers, Mechanical and Electrical Repairs at the 96th Medical Group, Main and Dental Clinics, Buildings 02825 and 02751 at Eglin AFB, FL Corrected deficiencies in the emergency power supply system (EPSS) Replaced aged and failing digital programmable energy management HVAC control system to correct deficiencies in the mechanical infrastructure

Mechanical and Electrical Repairs at the 96th Medical Group Read More »

Repair Mechanical Systems

U.S. Army Huntsville Center Corps of Engineers, 23rd Medical Group,  Repair Mechanical Systems, Building 900, Main Clinic at Moody AFB, GA Replaced aged and failing chillers Replaced vet clinic HVAC with chilled water cooled unit Replaced dry transformers and repair grounding Replaced outside lighting. All work was completed in compliance with AFMSA Health Facilities Division

Repair Mechanical Systems Read More »

Replace Sewer System

U.S. Army Huntsville Center Corps of Engineers, Replace Sewer and Domestic Hot Water Systems, Medical Facilities Building 9000 at Fairchild AFB, WA KC replaced the sanitary sewer system and supporting vent stack system in its entirety and replaced domestic hot water system. Determined the temporary construction required to separate the construction zones from other surrounding

Replace Sewer System Read More »

Repair Mechanical Systems

Replaced aged and failing air handling units, building chiller, realigned chilled water and heating water system and replaced building outside lighting. KC repaired mechanical and lighting systems. All work was completed in compliance with the AFMSA Health Facilities Division quality standards and design principles. The medical facility remained fully operational during repairs. This project was

Repair Mechanical Systems Read More »

Prettyman Courthouse

FISC Buildout

GSA, Foreign Intelligence Surveillance Court (FISC) Buildout, Prettyman Court House, Washington D.C. KOMAN Construction performed a majority of the work on a compressed schedule during non-business hours (6pm-5am) to minimize the impact on courthouse functions. This design-build project encompassed the coordination, design, and construction with a compressed schedule and was completed as a fast-tracked type

FISC Buildout Read More »

CBP Logo

El Centro Sector Repair and Paint Parking Lots

CBP, Sector Repair and Paint Parking Lots, El Centro, CA Work included verification of the actual parking stall count, removal of parking blocks, cleaning all parking lot drains, installation of temporary mats at the building’s entry and exit points, mechanical sweeping of the lot, placement of construction stakes, and marking existing loop locations. KC conducted

El Centro Sector Repair and Paint Parking Lots Read More »

lift

Air Unit Electrical Infrastructure and Building Repairs

FA DRT San Angelo Air Unit Electrical Infrastructure and Building Repairs, San Angelo, TX KC repaired and refurbished the existing “lean-to” building including HVAC systems, lighting, electrical, wall framing, drywall, insulation, painting, flooring, and steel storage mezzanine. A new 300KW diesel generator with a 700+ gallon belly tank and automatic transfer switch (ATS), protected by

Air Unit Electrical Infrastructure and Building Repairs Read More »