Replaced aged and failing air handling units, building chiller, realigned chilled water and heating water system and replaced building outside lighting. KC repaired mechanical and lighting systems. All work was completed in compliance with the AFMSA Health Facilities Division quality standards and design principles. The medical facility remained fully operational during repairs. This project was completed on a fast track schedule and received an “Exceptional” CPARS rating.