new vehicle lifts

Eagle Pass Repairs

FM DRT, Eagle Pass Repairs Full remodel with removal of existing and provision of new walls, ceilings, wall tile, floor ceramic tile, shower fixtures, lavatory fixtures including drains, basins, and fixtures for Men’s and Women’s gym locker room showers. Gym removal and remodel included replacement of the acoustical ceiling tile and Grid system, with attendant […]

Eagle Pass Repairs Read More »

Facility Renovation

Facility Renovation Future Firefighting Trainer, San Diego, CA KC completed the demolition and reinstall of a next-generation firefighter trainer, a multi-level training device based on the shipboard dimensions of a Virginia Class vessel. Demolition included demolishing from top of crawl space slab to roof level, the reinforced concrete interior wall, the existing trainer walking flats,

Facility Renovation Read More »

dental instrument processing center

Dental Instrument Processing Center (DIPC) Renovation

Renovate Dental Instrument Processing, Bolling AFB A complete design for a new, functional Dental Instrument Processing Center (DIPC) and three new offices, with work involving demolition, MEP, structural, architectural, and communications. KC coordinated all construction activities with the government. Requirements included moving, storing, re-setting furniture, and installing existing and new equipment. KC ensured minimal impact

Dental Instrument Processing Center (DIPC) Renovation Read More »

reconfiguring the foam releasing panel

Fire Suppression Repairs

Fire Suppression Repairs and Repair/Replace Fire Pumps, 162nd ARW, Arizona National Guard, Tucson Airport, Tucson, AZ Work included reprogramming/reconfiguring the foam releasing panel, replacing the manual foam releasing stations and conduits, and installing surge protection devices. KC repaired four water pumps and installed two new pumps at Ft. Huachuca. Installed new diesel engine water pump

Fire Suppression Repairs Read More »

Facility Upgrade

Coyote Lanes Facility Upgrade, Yuma Proving Grounds, Yuma, AZ Work included installing upgraded emergency lighting and exit signs, replacing smoke sensing fire detectors, and replacing split systems with air cooled condensing units for future installation of an additional condensing unit. KC performed demolition and replacement of the existing kitchen exhaust fan system and relocated the

Facility Upgrade Read More »

Exterior of vet clinic

Vet Clinic Renovation

Fire Suppression Repairs and Repair/Replace Fire Pumps, 162nd ARW, Arizona National Guard, Tucson Airport, Tucson, AZ KC completed interior and exterior renovations, electrical and mechanical upgrades, exterior repairs and improved aesthetics of the building, parking lot repairs, and painting. Additional tasks included roof repairs and upgrades, waterproofing, shielding, replacement of HVAC, bathroom renovations, cabinet and

Vet Clinic Renovation Read More »