Install New Track Turf, Power Service and Field Lighting

USACE Louisville District, Install New Track Turf, Power Service, and Field Lighting, Field Area at Fort Hunter-Liggett, CA

KC provided all labor, materials, equipment, supplies, and consultant services as required for the installation of new running track, artificial turf, power service extension and field lighting. This project was a design-bid-build project. Artificial turf and lighting system was laid out on a section of vacant land which was excavated, compacted, leveled to subgrade, and built back up with the artificial turf system’s base, installed over a complete geotextile fabric separation layer to meet USACE’s specifications and standards.