FM DRT, Eagle Pass Repairs
Full remodel with removal of existing and provision of new walls, ceilings, wall tile, floor ceramic tile, shower fixtures, lavatory fixtures including drains, basins, and fixtures for Men’s and Women’s gym locker room showers. Gym removal and remodel included replacement of the acoustical ceiling tile and Grid system, with attendant support systems wires, as well as conditioned air supply, return diffusers, light fixtures to be controlled through existing circuitry cabling and other repairs and replacements. Other building areas required electrical, plumbing, other utility, exterior and interior finishing. Provision of new security gates, vehicle lifts, and overhead rollup doors.