Trail Creek FOB Generator Replacement
KC removed and properly disposed of two existing generators and installed two new 25k, 12/240v Generac generators. KC had to ensure that they were able to operate in a solar power facility, be liquid cooled, have an electric start (battery), be propane powered, and function 3-4 days in a week with a few days of non-use between. KC installed a manual lead/lag switch to ensure that the generators could be used separately and alternately. Due to the generators being in an enclosed area of the building, intake and exhaust venting was installed.