Recent Posts by KomanKC

Emergency Boiler Replacement at the 375th Medical Group Building 1530

Scott AFB Clinic, Scott AFB, Illinois Contract amount: $2,873.286.23 Replace a failed high pressure steam boiler sized for summer clinic loads and associated accessories. Determine the temporary construction required to separate the construction zones from other surrounding clinical and administrative spaces. CLIENT U.S. Air Force / U.S. Army Huntsville Center Corps of Engineers, 4820 University…
Read more

Repair Mechanical Systems at the 22nd Medical Group Clinic, Building 250

McConnell AFB Clinic, McConnell AFB, Kansas Contract amount: $3,826,332.97 Replace aged and failing air handling units, building chiller, realign chilled water and heating water system and replace building outside lighting. Determine the temporary construction required to separate the construction zones from other surrounding clinical and administrative spaces. CLIENT U.S. Air / U.S. Army Huntsville Center Corps…
Read more

Mechanical and Electrical Repairs at the 96th Medical Group, Buildings 02825 and 02751

Main and Dental Clinics at Eglin AFB, Florida Contract amount: $2,924,787.88 Correct deficiencies in the Emergency Power Supply System (EPSS) and to correct deficiencies in the Mechanical Infrastructure by replacing aged and failing Digital Programmable Energy Management HVAC Control System; Replacing two 350 HP boilers and replacing the Dental clinic chiller. CLIENT U.S. Air Force /…
Read more

Install New Track Turf, Power Service and Field Lighting

Field Area at Fort Hunter-Liggett, California Contract amount: $941,060.25 Provide all labor, materials, equipment, supplies, and consultant services as required for the installation of New Running Track, Artificial Turf, Power Service Extension and Field Lighting. CLIENT US U.S. Army Corps of Engineers, Louisville Romano Mazzoli Federal Building 600 Dr. Martin Luther King, Jr. Place Louisville, KY…
Read more

Recent Comments by KomanKC

No comments by KomanKC yet.